Zanussi ZCM1000X Manuel d'utilisateur Page 22

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 21
22
PRESSURE TESTING
1. The rapid injector is used as a pressure test point.
2. Connect the pressure gauge to the Rapid injector.
3. Check the supply pressure by turning the Rapid burner on and one other hotplate burner full on and light the
appropriate burner. The pressure should be :-
(i) for natural gas 20mbar.
4. Turn off the taps, disconnect the pressure gauge.
5. Check operation of each hotplate burner.
CHECKING THE HOTPLATE
Fit the burner crowns and caps ensuring that they are correctly seated. Fit the pan support. Check each of the
hotplate burners in turn by turning the hotplate to its full position and holding the knob depressed. As soon as the
burners are lit the knob can be released.
GENERAL NOTE
Instruct the user how to use the appliance and its ignition system. Refer the user to the wording in the inside
cover which gives advice on the safe operation of the appliance.
INSTALLATION INSTRUCTIONS
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24

Commentaires sur ces manuels

Pas de commentaire